Ski Resorts News
12/29/2020
The new slope 60 from the Versettla cable car mountain station down to the valley of Gaschurn, with its length of 7.5 km, enables almost unlimited skiing pleasure! A modern snowmaking system ensures and guarantees snow, so that you can ski down a perfect slope to the Alte Talstation.
High standards and great responsibility
In order to guarantee the conditions for the competitiveness of winter sports, i.e. the snow reliability, modern snow machines have been installed. A commitment to the principle of purity has been made in this area: only water and air will be used for the snowmaking. The construction of the new Gaschurn valley descent ensures the ever-important guarantee of snow, which enables the tourism industry to offer guests a reliable, high-quality skiing experience from December onwards.
Even more appealing valley descent
“Up until now, there has been only one ski route to the valley and no continuously prepared descent,” explains Martin Oberhammer, CEO at Silvretta Montafon. The existing descent was onlyaccessible for a few weeks during the winter season. What’s more, the new, continuously prepared piste is also viewed as an appealing alternative in bad weather, since it leads through several sections of forest. This makes it a great option if the weather at the top of the mountain is bad or visibility is restricted, since the new valley descent is partly protected against exposure to the weather.
A pleasant side effect of the new downhill valley run: the waiting times at the Versettla Bahn associated with the valley descent are thus a thing of the past.
And what is the best way to round off any eventful day of skiing? With a cosy stop for a bite to eat, of course. The Alte Talstation is located directly next to the new valley descent. With outstanding food and great beverages, as of now an authentic ‘pit stop’ in the Alte Talstation really is the crowning point of any active day of skiing. With DJ sounds included at the eight metre-long Valülla Bar or on the sun deck.
General information:
• Piste begins: Versettla Bahn summit station, 2,010 m
• Piste ends: Versettla Bahn valley station, 970 m
• Piste ends: Versettla Bahn valley station, 970 m
• Elevation difference: 1,040 m
• Piste length: 7.5 km
• Snow conditions: 100% snow guarantee from December to April
• Route: Piste 60a, Route R62 and R60b will become the Gaschurn valley descent/P60
• New steep slope: 40 m wide and 175 m long
• Piste length: 7.5 km
• Snow conditions: 100% snow guarantee from December to April
• Route: Piste 60a, Route R62 and R60b will become the Gaschurn valley descent/P60
• New steep slope: 40 m wide and 175 m long
Silvretta Montafon ski area news in video, season 2020-21
Latest Resort News
Helmissimo: A New 10-Seater Gondola Set to Transform the 3 Zinnen Dolomites Ski Area
The 3 Zinnen Dolomites ski area in South Tyrol, Italy, is preparing for a major infrastructure upgrade ahead of the 2026/2027 winter season. The new HELMISSIMO 10-seater premium gondola in Versciaco will bring faster access to Monte Elmo (Helm), increase lift capacity and improve the overall skiing experience.
11/06/2026
La Clusaz Unveils New Six-Seater Balme Chairlift for the 2026–2027 Ski Season
La Clusaz, one of the most popular ski resorts in the French Alps, is preparing a major upgrade to its mountain infrastructure with the installation of a brand-new six-seater detachable chairlift in the iconic Balme sector. The new lift, built by French manufacturer POMA, is set to transform access to one of the resort's most spectacular high-altitude skiing areas for the 2026–2027 winter season.
11/04/2026
L’Alpe du Grand Serre Saved: 30-Year Deal and Investment
L’Alpe du Grand Serre, one of the oldest ski resorts in the French Alps, has been saved from permanent closure after signing a 30-year operating agreement with SATA Group. The deal, signed on 30 September 2026, secures the resort’s long-term future and paves the way for its reopening on 19 December 2026. With investments of up to €17 million planned, the resort near Grenoble is preparing for a new chapter in its history.
11/03/2026